The Tile Association | Find Tilers, Stockists and Fitters
 

Tiling to raised flooring systems supported by pedestals

Raised flooring systems are installed at a late stage during the construction process when it is assumed that the building is in a stable and weather tight condition. The main contractor should ensure that the raised flooring system is installed to appropriate Standards at the correct time during the building process.

The content you are trying to access is only available to members. Sorry.

Table of Contents

1 Foreward
2 Design Considerations
2.1 …Access
2.2 …Heating
3 Raised Flooring Systems
3.1 …Steel encapsulated flooring system
3.1.1 ……Description
3.1.2 ……Installation
3.1.3 ……Preparation for Tiling
3.1.4 ……Tile Fixing
3.1.4.1 ………Fixing to Steel Encapsulated Raised Flooring Systems
3.5 …Grouting
3.2. ……Calcium sulfate tongue and groove raised flooring system
3.2.1 ……Description
3.2.3 ……Preparation for Tiling
3.2.4 ……Tile Fixing
3.2.4.1 ………Direct fixing
3.2.5 ……Grouting
4. …Underfloor heating systems
5. …Wet Areas
5.1 …Steel encapsulated flooring system
5.2 …Calcium sulfate tongue and groove flooring system
6. …Movement joints
7. …Cleaning and maintenance
8. …Bibliography
9. …Members of the Working Group